Home
 Introduction
 Key Concepts
 Download
 Implementation
AIXM Viewer
Digital NOTAM
Specifications
EUROCONTROL
FAA
TUD Trials
Industry
Open Source Projects
 Community
 Archive
 

FAA Digital NOTAM Project

Digital NOTAM will be the final step of the United States NOTAM System modernisation. The milestones in this process are indicated in the table below. The first step is to provide a single source of US NOTAMs leading to a single United States Federal NOTAM System. Afterwards, the United States will take steps to ensure all US NOTAMs follow ICAO NOTAM standards.
FAA roadmap for NOTAM system modernisation
Computer interpretable (AIXM 5 encoded) NOTAMs are planned to be issued starting with 2010. It is expected that this will provide:
Better flight planning
Assisted situation awareness
Assisted navigation
The project was presented at the recent Global AIM Congress 2007. A recording of the presentation was made. You can download the PDF version of the presentation using the links below. You can also watch the movie online as a data stream (or right-click the link with your mouse and save the file to your computer).
  Acrobat Download the PDF presentation
  Watch the Movie

Digital NOTAM Submission Trial

FAA is developing a Digital NOTAM System (concept demonstrator) combining an AIM database, charting, publishing and quality control functions. NOTAM originators at the airport will be provided system and user interfaces for digitally submitting candidate NOTAMs. Downstream, user interfaces and system interfaces will support digital NOTAM distribution.


Industry Requirements for Digital NOTAM Submission - August 29 2007

More than 110 participants from the FAA, airlines, airports and the aviation industry gathered at the Federal Aviation Administration to discuss plans for Digital NOTAM submission. The purpose of the meeting was to introduce the Digital NOTAM concept and identify a working group to develop specifications for Digital NOTAM submission.

As part of the meeting EUROCONTROL and the FAA discussed the global strategy for Digital NOTAM with emphasis on joint FAA/EUROCONTROL cooperation. The FAA team demonstrated the proof of concept Digital NOTAM system. The participants also reviewed operational and technology issues that need to be addressed by the Industry/FAA working group for Digital NOTAMs.

The presentations from the meeting are listed below:
  Acrobat 01 Introduction Digital NOTAM submission
  Acrobat 02 EUROCONTROL Digital NOTAM
  Acrobat 03 NOTAM Realignment Master Brief44
  Acrobat 04 Introduction to Digital NOTAM submission
  Acrobat 05 NOTAM Industry Day 08292007_DNIntroduction
  Acrobat 06 NOTAM Industry Day 08292007_Details
  Acrobat 07 NOTAM Industry Day 08292007_DataModel
  Acrobat 08 Digital NOTAM and SWIM
  Acrobat 09 Working Group
  Acrobat Final Agenda
  Acrobat Draft Charter

Digital NOTAM Submission Working Group Meeting #1 - October 12 2007

The presentations and minutes of the meeting that took place in Washington DC on October 12 can be found below:
  Acrobat Introduction
  Acrobat NOTAM Data Model
  Acrobat Web Services
  Acrobat Workflow Proposal
  Acrobat Minutes of Meeting

Digital NOTAM Submission Working Group Meeting #2 - December 52007

The presentations from the meeting that took place in Washington DC on December 5 can be found below:
  Acrobat Welcome, Review and Policy
  Acrobat Temporality
  Acrobat Metadata
  Acrobat EUROCONTROL Digital NOTAM Trial
  Acrobat Concept of Operations
  Acrobat Event Model
  Acrobat Interface Control Document
  Acrobat Minutes
 
  Last validation: 25/03/2009  
|  Home  |  Contacts  |  Disclaimer  |
  Send comments and questions on this page to Content Supplier: esther.gerris-lahou@eurocontrol.int

© AIXM